Surat-Bilimora section of India's first bullet train corridor gets overhead power supply

Overhead electrical power supply has been installed along the 50-km Surat-Bilimora stretch of India's first bullet train project. The milestone marks a step forward in readying the corridor's track for operations. Electrification of this segment is a key requirement before trains can run on the line. The work forms part of the broader high-speed rail project being built between Mumbai and Ahmedabad.
This is an AI-generated summary. ShortSingh links to the original source for the complete article.
Discussion (0)
Log in to join the discussion and vote.
Log in