SShortSingh.
Back to feed

Sikkim to get first train link by 2027; Rlys fast-tracks Rs 9,000 crore Gangtok line

0
·4 views

The 44.5-km Sivok-Rangpo railway line is being constructed at an estimated cost of Rs 17,124 crore and will provide Sikkim with its first direct railway connection. The Rangpo-Gangtok line would serve as an extension of the railway network once the ongoing Sivok-Rangpo project, connecting Sivok in Darjeeling with Rangpo in East Sikkim, is completed.

Read the full story at Times of India

This is an AI-generated summary. ShortSingh links to the original source for the complete article.

Discussion (0)

Log in to join the discussion and vote.

Log in

Related stories