Mumbai-Ahmedabad Bullet Train to Launch on Surat-Bilimora Stretch by 2027
India's first bullet train corridor connecting Mumbai and Ahmedabad is making steady progress. The project will begin partial operations between Surat and Bilimora in Gujarat using Indian high-speed trains in 2027. Japan's next-generation E10 Shinkansen trains are planned for introduction on the route after 2030. The corridor is expected to significantly cut travel time between the two major cities.
This is an AI-generated summary. ShortSingh links to the original source for the complete article.
Discussion (0)
Log in to join the discussion and vote.
Log in