Madhya Pradesh bridge built in 2023 stands without any connecting roads

A bridge constructed in Madhya Pradesh in 2023 has been left without any roads leading to it, rendering it largely unusable. The structure, which was completed relatively recently, sits isolated with no access routes for vehicles or pedestrians. The report highlights the gap between the infrastructure built and the connectivity needed to make it functional. Local concerns center on how the project was planned and why the approach roads were not completed alongside the bridge.
This is an AI-generated summary. ShortSingh links to the original source for the complete article.


Discussion (0)
Log in to join the discussion and vote.
Log in