India's first bullet train to begin trial runs on Surat-Vapi stretch by mid-2027
Indian Railways is preparing trial runs of the B28 bullet train on the 100-km Surat-Vapi section of the Ahmedabad-Mumbai High Speed Rail corridor. The trials are targeted for May-June 2027. Commercial operations on this stretch are expected to begin in August 2027. The report also outlines the features passengers can expect from the country's first bullet train.
This is an AI-generated summary. ShortSingh links to the original source for the complete article.
Discussion (0)
Log in to join the discussion and vote.
Log in