How to Run a Pre-Mortem: A Launch Facilitation Script and Template
A pre-mortem is a short planning meeting where a team assumes a launch has already failed and works out why. The method, developed by psychologist Gary Klein around 30 years before his 2021 write-up, was first described in Harvard Business Review in 2007. Klein's basic version can take as little as 20 to 30 minutes, while product manager Shreyas Doshi's format runs one hour and sorts threats into Tigers, Paper Tigers and Elephants. The approach works by encouraging silent, independent writing and framing failure as certain, which makes dissent feel cooperative rather than disloyal. A 2010 study of 178 students found the pre-mortem reduced overconfidence more than other critique methods, though it was a lab setting rather than a field trial. The article stresses that the real value lies in the ranked, owned list of threats tracked until launch day.
This is an AI-generated summary. ShortSingh links to the original source for the complete article.
Discussion (0)
Log in to join the discussion and vote.
Log in