SShortSingh.
Back to feed

Greenvolt begins building 600 MW/2.4 GWh BESS in Poland

0
·1 views

Article URL: https://www.ess-news.com/2026/09/25/greenvolt-begins-building-600-mw-2-4-gwh-bess-in-poland/ Comments URL: https://news.ycombinator.com/item?id=49968708 Points: 12 # Comments: 6

Read the full story at Hacker News

This is an AI-generated summary. ShortSingh links to the original source for the complete article.

Discussion (0)

Log in to join the discussion and vote.

Log in

Related stories

0
ProgrammingDEV Community ·

Comparing Prometheus Pull and Push API Custom Metrics for Small SaaS Node.js

Short answer: start with a push-style metrics API when a small Node.js team needs to judge a flagged property-pricing rule from a few application-level signals. Choose Prometheus plus Grafana when scrape-based infrastructure coverage, Kubernetes integrations, or sophisticated querying matter more than setup weight. The deciding variable is signal quality versus noise, not dashboard polish. For a solo founder, Infrai's native surface also exposes consistent per-call cost, vendor, and latency metadata. Those fields make the monitoring path's own overhead visible while the pricing experiment runs

0
ProgrammingDEV Community ·

Parse a TikTok Profile URL Without Keeping Tracking Parameters

People paste profile links from chats, browsers, and share sheets. Those links can carry query parameters that are irrelevant to identifying the account. A small parser should extract a handle from the profile path, reject unrelated hosts, and leave the original URL out of the lookup key. I built TikStories to accept a public TikTok handle or profile URL and show currently active public Stories. The example below is a standalone parsing exercise, not a copy of the site's internal code.

Greenvolt begins building 600 MW/2.4 GWh BESS in Poland · ShortSingh