SShortSingh.
Back to feed

Gadkari skips Mumbai-Goa Expressway event, cites shame over project delays

0
·45 views

Union Minister Nitin Gadkari has declined to attend an event related to the Mumbai-Goa Expressway, expressing shame over the prolonged delays in its completion. The minister made clear that he finds it difficult to face the public given how long the project has taken. Gadkari simultaneously warned that strict action would be taken against contractors and officials found responsible for delays and poor-quality work on infrastructure projects. His remarks signal a tougher stance from the ministry on accountability in public infrastructure delivery.

Read the full story at NDTV

This is an AI-generated summary. ShortSingh links to the original source for the complete article.

Discussion (0)

Log in to join the discussion and vote.

Log in

Related stories

0
IndiaTimes of India ·

Former CDS Anil Chauhan warns of cognitive warfare threat to India

In a recent lecture, former Chief of Defence Staff General Anil Chauhan stressed the growing importance of cognitive warfare and emerging security challenges. He called for strategic thinking to be built into India's education system to raise national security awareness among citizens. Chauhan also proposed closer collaboration between universities and military institutions on research and strategic studies. He further warned against using economic interdependence as a weapon and urged ethical preparedness in shaping strategy.

0
IndiaNDTV ·

White House Briefly Locked Down After Car Crashes Into Signpost

The White House was reportedly placed under a temporary lockdown after a car crashed into a signpost nearby. Videos circulating online show smoke rising from the car's bonnet while security officials moved quickly to contain the situation. The report does not provide details on injuries or the cause of the crash. The incident was described as temporary, and the lockdown has since been lifted.

0
IndiaTimes of India ·

Bihar bans firecrackers and private boat operations near ghats before Chhath Puja

The Bihar government has imposed restrictions on the use of firecrackers and on private boat operations around riverside ghats ahead of Chhath Puja. The measures are aimed at ensuring public safety during the festival, when large crowds gather at the water's edge. Officials have framed the curbs as a precaution against accidents and congestion at the ghats. The restrictions are intended to be enforced in the period leading up to and during the festival.

0
IndiaNDTV ·

NASA Scientist Counts 34,000 Farm Fires in Punjab and Haryana, Far Above Official Tally

A NASA-linked aerosol scientist, Dr Hiren Jethva, has reported 34,000 farm fires across Punjab and Haryana between October 1 and November 9 this year. His figure is considerably higher than the approximately 4,500 fires reported by the states. Jethva is associated with Morgan State University and NASA's Goddard Space Flight Centre. The discrepancy highlights differences between satellite-based fire detection and official reporting.