Flash Floods Hit Kishtwar Hydro Project Site, Block Key Highway in J&K

A sudden flash flood struck the under-construction 540 MW Kwar Hydroelectric Project in Kishtwar, Jammu and Kashmir. The flood brought a destructive surge of water, mud, and large boulders that overwhelmed the project site within minutes. Construction machinery at the site was buried under the debris caused by the rapid flood. The incident also resulted in the blocking of a highway in the region, disrupting connectivity.
This is an AI-generated summary. ShortSingh links to the original source for the complete article.


Discussion (0)
Log in to join the discussion and vote.
Log in