Edge Approvals Lapse When an Outline Changes, Even if the Edge Pattern Stays the Same
The article describes how an approval on a drawing revision should record the specific design elements a reviewer signed off on. Using a synthetic rug drawing, it explains that an edge pattern's approval depends on the outline version in effect at the time of sign-off. A change in outline shape moves where the motif meets the edge, so the edge approval must return to review even though the edge file version is unchanged. The approach stores outline approvals as single values and edge approvals as outline-and-edge version pairs, with unrecorded dependencies requiring fresh review. Keeping the two checks separate lets an edge revision leave a valid outline decision intact, while a physical edge sample approval should be tracked as its own record.
This is an AI-generated summary. ShortSingh links to the original source for the complete article.
Discussion (0)
Log in to join the discussion and vote.
Log in