BRO Rebuilds Washed-Away Sikkim Bridge in Just 5 Days

The Border Roads Organisation has restored a bailey bridge in Dzongu, Sikkim, within five days of it being destroyed. The bridge was swept away on June 28 following heavy overnight rainfall in the region. Its collapse had cut off road connectivity for local residents in the area. The swift reconstruction by BRO has restored access and normalcy to the affected region.
This is an AI-generated summary. ShortSingh links to the original source for the complete article.

Discussion (0)
Log in to join the discussion and vote.
Log in