BRO clarifies excavator work at Sheshnag lake is post-Amarnath Yatra maintenance

The Border Roads Organisation has clarified that an excavator spotted at Sheshnag lake is part of routine work carried out after the Amarnath Yatra concluded. The machinery was deployed for post-pilgrimage restoration and clean-up activities in the area. BRO said the operation is planned and not an unauthorised intervention at the high-altitude lake. The clarification was issued following public attention to the equipment's presence near the water body. The work is expected to be completed as part of the regular post-yatra maintenance schedule.
This is an AI-generated summary. ShortSingh links to the original source for the complete article.
Discussion (0)
Log in to join the discussion and vote.
Log in