Assam Flood-Hit Rail Link Restored, Train Services Back on Track

Train services in Assam have resumed after a flood-damaged rail link was successfully restored. Northeast Frontier Railway General Manager Chetan Kumar Shrivastava personally visited the affected sections to oversee recovery efforts. He conducted a thorough inspection of tracks, bridges, and related infrastructure in the region. The restoration marks a significant step in restoring normal rail connectivity disrupted by flood damage in the area.
This is an AI-generated summary. ShortSingh links to the original source for the complete article.

Discussion (0)
Log in to join the discussion and vote.
Log in