SShortSingh.
Back to feed

7-year-old girl raped and killed at Ghaziabad mall construction site, two detained

0
·12 views

A seven-year-old girl was sexually assaulted and murdered at a mall construction site in Ghaziabad. Her brothers witnessed two men lure her away with chips and a cold drink before she went missing. Police identified and detained two suspects, including a juvenile, after reviewing CCTV footage from the site. The accused allegedly assaulted the child and discarded her body down a shaft. Her remains were recovered approximately five hours after she was reported missing.

Read the full story at Times of India

This is an AI-generated summary. ShortSingh links to the original source for the complete article.

Discussion (0)

Log in to join the discussion and vote.

Log in

Related stories

0
IndiaTimes of India ·

Zelenskyy Says Ceding Donbas Would Not End the War

Ukrainian President Volodymyr Zelenskyy argued that handing over the Donbas region would not stop future Russian invasions. He said security guarantees lacking credible enforcement would be inadequate. He pointed to the failure of earlier international assurances made after Ukraine gave up its nuclear arsenal in the 1990s. He also questioned how effective proposed US security arrangements, modeled on NATO-style commitments, would actually be. The remarks underscore Kyiv's ongoing concern over its territorial integrity amid Russian aggression.

0
IndiaTimes of India ·

Hegseth says impeachment bid signals US will punish its own warriors

US Defense Secretary Pete Hegseth has responded to an effort to impeach him by saying the move sends a message that Washington will punish its own service members. He framed the impeachment push as a signal aimed at the military rather than a matter of policy disagreement. The remarks came as lawmakers advanced or discussed the impeachment bid against him. The article provided only limited detail beyond his characterization of the effort's implications.

0
IndiaIndian Express ·

Indian Railways commissions 15-km doubling project on Howrah-Visakhapatnam route

Indian Railways has commissioned a 15-kilometre doubling project aimed at expanding train operations on the Howrah-Visakhapatnam route. The added track capacity is intended to ease congestion and allow more trains to run on the busy corridor. Officials frame the project as a step toward smoother and more efficient rail movement between eastern and southern India. Details on the exact stretch and timeline are drawn from the original report published by the Indian Express.